Mash Tun. Beerbrew 30 with bypass on internal controller 2,5Kw heat. Only 5L water to reduce heating time. (and overshoot temp fluctuate extra)
HERMS with 2Kw (Tube on right side.)
Sparge water in back. 2,5Kw
Rasperry pi 3. Craftbeerpi 2.2.
GUI (Graphic User Interface) on LCD monitor or command line. With Command Line (CL) is Safari browser used to control CBP.
Red is sencors. Yellow is heaters
Sensors:
Wort out from HERMS.
Wort from mash tun in to HERMS
Water temperatur in HERMS
Temperature in mash tun.
Temperature in sparge water.
Heaters:
6. HERMS 2Kw
7. Mash tun 2,5Kw.
8. Sparge water 2,5Kw.
Wish:
I want to use heater in both mash tun and HERMS to rise temperature fast. And use only HERMS to maintain temperature. So if mash tun could run parallel to 1 degree below setpoint to HERMS would be perfect. (I do this manually today)
Testing different setup.
Test#
Logic
Sensor
Heater
Kettle
Temperatur
Result
GUI
Graph
#1
Overshoot
NO 1.
No6
HERMS
50C 10 min. 60C 10min. 65C 40min.
77C 10min
OK. 1,5C above target
CL
#2
HERMS with PID.
NO 1.
No6
HERMS
50C 10 min. 60C 10min. 65C 40min. 77C 10min
HERMS OK.
CL
#3
HERMS with PID. Spargewater with overshoot
NO 1.
NO 5.
No6
No8
HERMS and spargewater
50C 10 min. 60C 10min. 65C 40min. 77C 10min
HERMS OK. Spargewater (80C)1,5C above target
CL
#4
HERMS with PID. Spargewater with overshoot.
Mash tun with overshoot
NO 1.
NO 5.
NO 4.
No6
No8
No7
HERMS, spargewater and MashTun
50C 10 min. 60C 10min. 65C 40min. 77C 10min
HERMS OK. Spargewater (80C)1,5C above target
Mash tun set 1C below hersm. Manual rise.
CL
3 Kettle setup
#5
HERMS with PID. Spargewater with overshoot.
Mash tun with overshoot
NO 1.
NO 5.
NO 4.
No6
No8
No7
NO2
NO3
HERMS, spargewater and MashTun.
Also thermometer for inlet and water in HERMS
50C 10 min. 60C 10min. 65C 40min. 77C 10min
HERMS OK. Spargewater (80C)1,5C above target.Mash tun set 1C below hersm. Manual rise.
GUI
3 Kettle and 2 Thermometers
#6
HERMS with PID. Spargewater with PID.
Mash tun with overshoot
NO 1.
NO 5.
NO 4.
No6
No8
No7
NO2
NO3
HERMS, spargewater and MashTun.
Also thermometer for inlet and water in HERMS
50C 10 min. 60C 10min. 65C 40min. 77C 10min
Temperature rise in all kettles.
CL
Notes
Test #4. Turned on RasperryPi and waited 1 hour before I used it. Everything hang. Off and on with power to solve this.
Test #6. 2 Kettles with PID did not work. It seems that both heaters tried to reach the highest setpoint.